Home/News Center/Shudao New Energy Xinjiang 900MW CSP Integration Project Completes First Cleaning Acceptance
Project Cases2024-11-05

Shudao New Energy Xinjiang 900MW CSP Integration Project Completes First Cleaning Acceptance

K-CRY-1P/2P dual-rail robot operates stably in extremely arid, sandy conditions, passing client quality acceptance.

Shudao New Energy Xinjiang 900MW CSP Integration Project Completes First Cleaning Acceptance

Challenge

The Xinjiang Gobi desert experiences extreme aridity, with annual dust accumulation more than 3 times that of eastern regions. Additionally, the project slope reaches 15°, which conventional wheeled robots cannot adapt to.

Solution

K-CRY-1P/2P Intelligent Dual-Rail Cleaning Robot with max 32° climbing capability, 70W self-power generation, APP remote control, requiring no on-site personnel.

Results

After the first cleaning, module efficiency recovered to 96%, with a cumulative cleaning area exceeding 1.2 million ㎡.

GET IN TOUCH

Ready to Get Started?
Let Cleaning Begin Here

Whether you are a PV power plant operator, EPC contractor or equipment integrator, KEENOVA can provide you with customized intelligent O&M solutions.