900 MW
Shudao PV + CSP Integration Project
Project Overview
The Shudao 900MW PV+CSP integrated project in Xinjiang Gobi desert faces extreme aridity, steep slopes up to 15°, and severe dust accumulation. KEENOVA deployed K-CRY-1P/2P Intelligent Dual-Rail Cleaning Robots with 32° max climbing capability and 70W self-power generation, enabling fully autonomous waterless dry cleaning via APP remote control. Module efficiency recovered to 96% after the first cleaning cycle.
Challenge
Steep slope · Water scarcity · Severe dust accumulation
- Blade defects: abnormal signals at 13kHz center frequency
- Gearbox noise: low-frequency wind noise (below 500Hz) and unstable sound signals
- Real-time warning: load anomaly determination and kurtosis coefficient analysis
Project Info
Location:
Xinjiang
Scale:
900 MW
Robots Used:
K-CRY-1P/2P · Intelligent Dual-Rail Cleaning Robot