Shudao PV + CSP Integration Project
馃嚚馃嚦Xinjiang
900 MW

Shudao PV + CSP Integration Project

Project Overview

Shudao PV + CSP Integration Project is located in Xinjiang with a scale of 900 MW. The project uses KEENOVA's self-developed bone conduction acoustic sensors (K-WDE-1000) and ultrasonic wideband sensors (K-WDU-3000), combined with cloud platform AI models for real-time analysis, achieving early warning and precise positioning of wind turbine blade defects, gearbox noise and other anomalies.

Challenge

Steep slope 路 Water scarcity 路 Severe dust accumulation

  • Blade defects: abnormal signals at 13kHz center frequency
  • Gearbox noise: low-frequency wind noise (below 500Hz) and unstable sound signals
  • Real-time warning: load anomaly determination and kurtosis coefficient analysis

Project Info

Location:

Xinjiang

Scale:

900 MW

Robots Used:

K-CRY-1P/2P 路 Intelligent Dual-Rail Cleaning Robot

Get Solution

Our experts will provide customized solutions

Contact Now

GET IN TOUCH

Ready to Get Started?
Let Cleaning Begin Here

Whether you are a PV power plant operator, EPC contractor or equipment integrator, KEENOVA can provide you with customized intelligent O&M solutions.