Yellow River Hydropower Golmud PV Project
🇨🇳Qinghai
690 MW

Yellow River Hydropower Golmud PV Project

Project Overview

Yellow River Hydropower Golmud 690MW PV project is located at the edge of salt lakes on the Qinghai-Tibet Plateau, with soft geology, over 80 sandstorm days per year, and severe calcium scaling causing thermal degradation. KEENOVA K-CRY-1P/2P Dual-Rail Robots use lightweight track design to adapt to soft foundations, and soft-brush dry cleaning effectively removes calcium deposits, significantly reducing hot-spot risks.

Challenge

Soft geology · Sandstorms · Calcium scaling & thermal degradation

  • Blade defects: abnormal signals at 13kHz center frequency
  • Gearbox noise: low-frequency wind noise (below 500Hz) and unstable sound signals
  • Real-time warning: load anomaly determination and kurtosis coefficient analysis

Project Info

Location:

Qinghai

Scale:

690 MW

Robots Used:

K-CRY-1P/2P · Intelligent Dual-Rail Cleaning Robot

Get Solution

Our experts will provide customized solutions

Contact Now

GET IN TOUCH

Ready to Get Started?
Let Cleaning Begin Here

Whether you are a PV power plant operator, EPC contractor or equipment integrator, KEENOVA can provide you with customized intelligent O&M solutions.