690 MW
Yellow River Hydropower Golmud PV Project
Project Overview
Yellow River Hydropower Golmud 690MW PV project is located at the edge of salt lakes on the Qinghai-Tibet Plateau, with soft geology, over 80 sandstorm days per year, and severe calcium scaling causing thermal degradation. KEENOVA K-CRY-1P/2P Dual-Rail Robots use lightweight track design to adapt to soft foundations, and soft-brush dry cleaning effectively removes calcium deposits, significantly reducing hot-spot risks.
Challenge
Soft geology · Sandstorms · Calcium scaling & thermal degradation
- Blade defects: abnormal signals at 13kHz center frequency
- Gearbox noise: low-frequency wind noise (below 500Hz) and unstable sound signals
- Real-time warning: load anomaly determination and kurtosis coefficient analysis
Project Info
Location:
Qinghai
Scale:
690 MW
Robots Used:
K-CRY-1P/2P · Intelligent Dual-Rail Cleaning Robot