🇲🇽Mexico
162 M
Zuma OREJANA PV Project
Project Overview
Zuma OREJANA 162MW PV project is adjacent to the Pacific coast, with soft geology, severe salt fog corrosion, and single-axis tracking mounts. KEENOVA deployed K-CR-C003 Tank PV Cleaning Robots with track+wheel composite chassis adapted for soft geology, soft-brush dry cleaning with zero water consumption, autonomous operation on 0–5° variable angle tracking mounts, achieving an 18% power efficiency increase after 6 months.
Challenge
Near seashore · Soft geology · Tracking modules
- Blade defects: abnormal signals at 13kHz center frequency
- Gearbox noise: low-frequency wind noise (below 500Hz) and unstable sound signals
- Real-time warning: load anomaly determination and kurtosis coefficient analysis
Project Info
Location:
Mexico
Scale:
162 M
Robots Used:
K-CR-C003 · Tank PV Cleaning Robot
GET IN TOUCH
Ready to Get Started?
Let Cleaning Begin Here
Whether you are a PV power plant operator, EPC contractor or equipment integrator, KEENOVA can provide you with customized intelligent O&M solutions.